Project Progress

Contract No
NE/2016/01
NE/2016/05
NE/2017/03
ED/2020/02
ED/2019/02

Please click the green shaded areas to see the latest works progress videos and photo.

Please click the orange and blue shaded area to see the latest works progress photo.

Hiu Kwong Street and Hiu Ming Street

Near Tseung Kwan O Tunnel Toll Plaza

Please click the yellow shaded area to see the latest works progress photo.

Road Improvement Works 1

Road Improvement Works 2

Road Improvement Works 3

Pedestrian Connectivity Facilities System A and System B

Pedestrian Connectivity Facility E8

Please click the color shaded area to see the latest works progress photo.

Please click the color shaded area to see the latest works progress photo.

Escalator System (EL1)
Connecting Sau Mau Ping Road and existing footbridge of Po Tat Estate

Escalator System (EL2)
Connecting Sau Mau Ping South Estate and existing footbridge of Sau Mau Ping Road


Proposed FB1 footbridge with lift tower and staircase
Between Hiu Kwong Street and podium of Sau Ming Estate


Proposed FB2 footbridge with lift tower and staircase
Between Sau Mau Ping Road and podium of Po Tat Estate